Steel Counterweight Boxes being lowered into the bridge towers |
|
Bridge span being constructed on land |
|
1400-ton completed bridge span being slowly rolled towards the barge |
|
18-20 axle bridge span transports |
|
Bridge rolling onto the barge |
|
Ballast pump keeping barge level as bridge weight is added |
|
Two ballast pumps working |
|
Bridge span almost completely on the barge |
|
The next day, 90-ft wide barge carrying 300-ft bridge span to the channel |
|
Barge with bridge approaching the bridge towers |
|
Completed bridge in the down position for railroad crossing |
|
Completed bridge in the up position for channel traffic |
![]() |
Japan Imperial Palace walls coming out of canal |
![]() |
Parabolic curve of the Imperial walls |
![]() |
Relative Size image of Imperial Palace wall corner ashlar blocks |
![]() |
Crane sliding a concrete table out of the side of the building |
![]() |
UPS docking bay doors, pre-poured, rigged for lifting |
![]() |
Lifting a door--note the crane getting "light" on the back track |
![]() |
A lifted door |